TMI Coatings was contracted to prepare interior and exterior surfaces of two tanks and the structural steel frames around the tanks. Our customer had concerns about dust and paint chips traveling to adjacent rooms. We used poly to section off areas to reduce this risk and installed ground covering.
The TMI team mechanically abraded the tanks and structural steel using hand-held grinders with vacuum attachments to minimize the dust. We then installed a black urethane elastomer lining, which is suitable for CIP and cooling tower water, on the interior of the tanks. Finally, we applied an epoxy on the exterior of the tanks and on the structural steel.
The project team was able to successfully complete the project within a very tight time frame to comply with the owner’s schedule.
The TMI Coatings Team