TMI Coatings Blog

Painting and Restoration Contractors

TMI Coatings Blog header image 4

Mississippi River Conveyor Project

June 15th, 2010 · No Comments · Coatings

While on site completing restoration and coating of silos and a head house at a grain facility in Iowa, TMI Coatings prepared and coated a conveyor over the Mississippi River, including the catwalk, structural walkway, staircase, bents, tower and barge load out spout. The existing paint on the conveyor contained lead so TMI had to [...]

[Read more →]

Tags:·····